Integration

Your Procore data, analyzed.

Close the feedback loop between your estimates and what actually happens on the job. 25+ endpoints, synced every 4 hours.

Sync Scope

Projects, vendors, commitments — everything.

Six data categories, 25+ endpoints, one-way sync from Procore into PreconIntel. Your estimating system finally sees what the construction side is doing.

  • Projects, vendors, commitments, change orders
  • Drawings, estimates, requisitions, cost codes
  • One-way sync (read-only from Procore)
  • Delta sync — only what changed
Procore · active sync
Connected · last sync 6 min ago4-hour cycle
Projects128synced
Vendors342synced
Commitments1.2Ksynced
Change Orders187synced
Drawings4.8Ksyncing…
Cost codes612synced
CSI Mapping

Cost codes speak CSI.

Every Procore cost code auto-maps to 3-digit MasterFormat divisions. Override any mapping manually; the system learns from your corrections.

  • Automatic Procore ↔ CSI MasterFormat mapping
  • Manual overrides persist across projects
  • Custom cost-code libraries supported
  • Division-level + item-level rollups
Cost code ↔ CSI
03-10-0003-10 Concrete Forming
03-30-0003-30 Cast-in-Place
26-05-0026-05 Common Elec. Req
23-00-0023-00 HVAC
09-90-0009-90 Painting
Cost Feedback Loop

Actuals teach your next estimate.

Every awarded commitment and change order flows back into PreconIntel's benchmark engine. The estimate for your next project reflects what the last one really cost.

  • CO data adjusts benchmarks automatically
  • Variance flagged by division & region
  • Regional, seasonal, and market normalization
  • Full audit trail: estimate → award → actual
Benchmark feedback loop
Detected — CO on Project RW-14
CSI 03-30 actual ran 8.2% higher than estimate.
Benchmark adjusted for Austin market · next estimate uses updated rate.
$ benchmark update csi=03-30 region=austin
  rate_before: $412/cy
  rate_after: $446/cy
Setup

OAuth connect. 10 minutes to first sync.

No consulting engagement required. Approve scopes, pick projects, map cost codes, run. Ongoing sync every 4 hours, with manual trigger anytime.

  • Standard Procore OAuth 2.0
  • Scope-limited (read-only) permissions
  • First-sync wizard — usually 4-8 min
  • 4-hour cycle + on-demand refresh
OAuth · 10 min setup
1
Connect Procore account
OAuth redirect, approve scopes
2
Select projects to sync
Pick all, or filter by status
3
Map cost codes to CSI
Auto-mapped, manual overrides
4
Run initial sync
Usually 4-8 minutes for mid-size GC
25+
sync endpoints
6
data categories
4 hr
sync cycle
0
manual export

Close the gap between estimates and actuals.

Your Procore data is already there. Let it make your next estimate smarter.

Start Free TrialBook a Demo